Use Probe to get table values of building nodesġ. Use Clipping Plane to see tunnel betterĭeactivate all mesh sets except building and raft1. Check Total Translation for case with No Pilesģ. Click Analysis ControlSet up as shown for both.ġ. Make Analysis Casefor Construction Set No Pilesģ. Make Analysis Casefor Construction Set with PilesĢ. Go to stage 2, modify case by removing pilesġ. Stage 8: Exca 6Activate Tunnel Wall 5&6Deactivate Tunnel Excavation 6Save > CloseĢ. Stage 7: Exca 5Activate Tunnel Wall 4Deactivate Tunnel Excavation 5Save > NewĢ. Stage 6: Exca 4Activate Tunnel Wall 3Deactivate Tunnel Excavation 4Save > Newġ. Stage 5: Exca 3Activate Tunnel Wall 2Deactivate Tunnel Excavation 3Save > NewĢ. Stage 4: Exca 2Activate Tunnel Wall 1Deactivate Tunnel Excavation 2Save > Newġ.
Stage 3: Exca 1Deactivate Tunnel Excavation 1Save > NewĢ. Stage 2: FoundationActivate foundation and building sets and BCSave > Newġ. Stage 1: InitialActivate only Soil Layers, gravity and BC- Clear Displacementsġ.
Static / Slope Analysis > Construction Stage > Stage Setģ. The CAD interface transfers project data for expanded analysis requiring soil-structure interaction and detailed 3D investigation such as bridge pier and tall building foundations.
Advance > RzRestrict rotation in Z axis of piles for stabilityġ. CAD Compatibility / Interface with other MIDAS Software GTS NX imports model information from other MIDAS software (Gen, Civil & SoilWorks). Static / Slope Analysis > Boundary > Constraint >Auto > ApplyĢ. Mesh > Element > Pile Interface &Pile Tipġ. Select Tunnel Excavation geometriesActivate: Skip Duplicate FacesĢ. MIDAS GEN has a new interface with MIDAS GTS NX, 3D geotechnical software, which allows the import/ export of the structure and results for the calculation of soil springs considering more real field conditions. Mesh Tunnel ExcavationsSize: 5m Property Mid SoilĢ. Import Property from GTS NX Steel Structure with soil and tunnel finalģ. The CAD interface transfers project data for expanded analysis. Use imprint command on building footing for mesh connection with raft.ġ. GTS NX imports model information from other MIDAS software (Gen, Civil &. Export structure from MIDAS Gen (MXT text file).2. Results > Solid Stresses > Plastic Statusġ. Shows Critical State of Tunnel Walls (Yield Stresses)Ģ. Results > Displacement > Total Translation Analysis Control > Activate options as shownġ. Static / Slope Analysis > Boundary > ConstraintĪctivate all except excavations3. Mesh 4th Soil LayerSize: 10m Property: Soft Rockġ. Mesh 3rd Soil LayerSize: 10m Property: Bot SoilĤ. Mesh 2nd Soil LayerSize: 10m Property: Mid Soilģ. Mesh Top Soil LayerSize: 10m Property: Top SoilĢ. Inspect MaterialsTunnel Concrete Max Yield Stress 7500kN/m^2 Geometry > Surface & Solid > Auto Connect2. Import Topographic DXF file and combine with bore hole strata informationġ. Integrated Solver Optimized for the next generation 64-bit platformįinite Element Solutions for Geotechnical Engineering